Phases of Development
01
I. Client Consultation
- Met with the client to determine the design criteria and properties of the sap collector. Measured the sap collection tube.
02
II. CAD Modelling and Prototyping
- The sap collector was modeled using Fusion. Prototypes were printed in PLA to test the fit of the collection tube.
03
III. Printing of Final Assembly
- A final sap collector was printed in ABS filament to withstand outdoor conditions.
Skills Developed
Product Images